This incident happened last Monday, at the Saraji Mine. I didn't get any other details, so if you know, please comment below.

Edit 7/9/12: Additional photo sent in.

12 comments:

Anonymous said...

This is a D 10T left in pit to close to blast zone it belonged to HSE Mining , blown up by BMA

Anonymous said...

fly rock got it...

Anonymous said...

I know BMA are cutting contractors as a result of the downturn, but this is a bit excessive...

Anonymous said...

Was left within 50 meters of a shot, the shot was fired without SSE approval or a sweep of the area. A D11 owned by HSE

Anonymous said...

It was a D10T the blast crew had told HSE mining that there was going to be a blast and how far to get the gear out. There was a digger in there but no one hurd about that

Anonymous said...

Blast was supposed to just lift, it didn't...

Anonymous said...

HA ha ha sucked in, great communication between the blast crew and HSE Saraji mine site shift supervisor. Nothing like collartoral damage to a Cat D10T.. I'm glad i don't own it.So much for BMA's regard for sop's on their site.

Jim Ball Louisville KY (USA) said...

What about the operator....was he out of the area?

Anonymous said...

This is typical HSE cowboy attitude. You probably didnt here about them smacking buckets together on 600 ton diggers or rolling dozers at Peak downs. Also how many companies have the project manager sacked on the spot? This is typical for HSE.

Anonymous said...

it was only a matter of time.i was working at saraji 3 weeks before,reported unsafe work practices,got abused for it .and then this happens

Anonymous said...

This Dozer was approximately 280m from the nearest loaded hole and the blast blew out a corner that was previously blasted and not taken into account that fly rock would blow out in that direction , all personal were out of the area.